Interfaces & mixed-signal

Garmo-SerDes-28G

Adaptive serializer/deserializer control architecture; electrical rate and signal-integrity qualification are separate.

Evaluation package
Request evaluation
GarInterfaces & mixed-signal
THE TECHNICAL ROLE

A clear integration boundary.

Garmo-SerDes-28G integration role: High-Speed I/O — 224 Gb/s-class adaptive SerDes. Documented composition: TX FFE, RX CTLE/FFE/DFE with adaptive DSP and continuous calibration; ADC-based PAM4 receiver with programmable equalizer tap budget; Digital CDR, baud-rate adaptation and multi-protocol gearbox.

01

TX FFE, RX CTLE/FFE/DFE with adaptive DSP and continuous calibration

02

ADC-based PAM4 receiver with programmable equalizer tap budget

03

Digital CDR, baud-rate adaptation and multi-protocol gearbox

TECHNICAL OVERVIEW

The details matter.

Download the product brief
Canonical identity
IP-2093
Responsibility
High-Speed I/O — 224 Gb/s-class adaptive SerDes
Documented interface architecture
ADC/AFE/DAC hard-macro boundaries, PCS gearbox, FEC metrics, CSR, test pattern
Documented building blocks
TX FFE, RX CTLE/FFE/DFE with adaptive DSP and continuous calibration; ADC-based PAM4 receiver with programmable equalizer tap budget; Digital CDR, baud-rate adaptation and multi-protocol gearbox
Delivery boundary
Evaluation / IP scope
Evidence scope
Evaluation package
Architecture targets · not measurements
1–224 Gb/s/lane, NRZ/PAM4, 112 GBd PAM4; >50 dB channel-loss adaptation target; <4 pJ/bit PHY power target on leading node.
Evaluation package

Know the release.
Know what it establishes.

Canonical technology and its architecture/integration role are recorded. The offered delivery is confirmed against the exact release before licensing.

Source basis: Bible v7.42 IP-2093. This is a controlled-portfolio summary, not a fresh execution of the chip qualification flow.

Release-specific qualification

Control/model IP does not establish analog PHY, electrical, RF or standards compliance. Qualified third-party or foundry collateral may be required.

Canonical record: P2 / REPRESENTATIVE ARCHITECTURE RTL — concrete integration specification and synthesizable RTL shell/representative datapath only; all frequency, throughput, power, area, jitter and standards-superiority figures remain architecture targets until the required evidence hierarchy closes. Electrical/PHY production claims require a characterized foundry/node hard-macro backend plus package/channel and compliance evidence.

A PATH THAT FITS THE PROJECT

Build with Garmo-SerDes-28G.

Technical scope, rights, support and release configuration are agreed before delivery.

evaluation

Evaluate an individual IP configuration

Inspect the named release and establish technical fit.

Discuss this scope
production

Named-design production license

Agree deployment or design rights, deliverables and support.

Discuss this scope
custom

Node binding or derivative integration

Define the customer-specific work and acceptance criteria.

Discuss this scope

Keep exploring.

Interfaces & mixed-signal

GSH-130A

Analog socket contract; digital management; calibration firmware path; AMS smoke flow; PEX/LVS/ERC/PVT collateral.

Qualified release
IP-004 · Controlled physical release
Interfaces & mixed-signal

Garmo-CAN-FD-CTL

Automotive CAN controller architecture for message processing, timing and host integration.

Evaluation package
IP-2086 · Source documented
Interfaces & mixed-signal

Garmo-LIN-CTL

Automotive I/O — 8-channel autonomous LIN controller

Evaluation package
IP-2090 · Source documented

Your next big idea.
Let’s build it together.

Start with a chip, a software release or a single IP block.

CANONICAL EVIDENCE RECORD · IP-2093

Source documented

A concrete source or implementation record exists; the selected evidence does not establish complete qualification.

Source: Bible 7.42 VERIFIED V29 · Bible v7.42 IP-2093.

Record integrity and qualification boundary

Retained exact-release source reference; no new table locator was inferred.

Evidence ranking for evaluation prioritization; not a probability or certification.

How evidence priority is determined ↗