Reliability & safety

FPP Test/Management Fabric

Known-good-die, test, health and repair coordination for FPP packages.

Architecture IP
Request evaluation
FPPReliability & safety
THE TECHNICAL ROLE

A clear integration boundary.

FPP Test/Management Fabric integration role: KGD/test/health/repair fabric. Documented composition: One of the co-designed package fabrics / bridge hierarchy.

01

Known-good-die and package test architecture

02

Package health and repair coordination

03

Test/management participation in the FPP fabric hierarchy

TECHNICAL OVERVIEW

The details matter.

Download the product brief
Canonical identity
IP-163
Responsibility
KGD/test/health/repair fabric
Documented building blocks
One of the co-designed package fabrics / bridge hierarchy
Delivery boundary
Architecture
Evidence scope
Architecture IP
Architecture IP

Know the release.
Know what it establishes.

Canonical technology and its architecture/integration role are recorded. The offered delivery is confirmed against the exact release before licensing.

Source basis: Bible v7.42 IP-163. This is a controlled-portfolio summary, not a fresh execution of the chip qualification flow.

Release-specific qualification

No node-port, silicon-performance, standards certification or analog qualification is inherited from a related product.

Canonical record: Architecture

A PATH THAT FITS THE PROJECT

Build with FPP Test/Management Fabric.

Technical scope, rights, support and release configuration are agreed before delivery.

evaluation

Evaluate an individual IP configuration

Inspect the named release and establish technical fit.

Discuss this scope
production

Named-design production license

Agree deployment or design rights, deliverables and support.

Discuss this scope
custom

Node binding or derivative integration

Define the customer-specific work and acceptance criteria.

Discuss this scope

Keep exploring.

Reliability & safety

Garmo-ASIL-D-Monitor

Safety-monitoring island architecture for fault detection, containment and supervised operation; functional-safety certification is not implied.

Evaluation package
IP-2088 · Source documented
Reliability & safety

GCF Lifeboat / Configuration Network

Configuration, SRAM init, BIST, characterization, isolation and defect patch transport

Architecture IP
IP-129 · Architecture / contract
Reliability & safety

GKRE

Quality vector; repair map; degraded-use grading; die pairing

Architecture IP
IP-102 · Architecture / contract

Your next big idea.
Let’s build it together.

Start with a chip, a software release or a single IP block.

CANONICAL EVIDENCE RECORD · IP-163

Architecture / contract

Architecture or interface scope is documented; release qualification must be bound before delivery.

Source: Bible 7.42 VERIFIED V29 · PART XII - MASTER NAMED IP INVENTORY ADDENDUM · table 551, row 77.

Record integrity and qualification boundary

9d8deb3065ea8e738e028de2df7d8610cea6f18aa3d4d258277e556037710d35

Evidence ranking for evaluation prioritization; not a probability or certification.

How evidence priority is determined ↗