---
title: FPP Test/Management Fabric | Garmo Labs
url: https://garmolabs.com/ip/fpp-test-management-fabric
description: Known-good-die, test, health and repair coordination for FPP packages.
---

[Ip](https://garmolabs.com/marketplace) › IP-163

Reliability & safety

# FPP Test/Management Fabric

Known-good-die, test, health and repair coordination for FPP packages.

Architecture IP

[Request evaluation](https://garmolabs.com/contact?products=ip-ip-163)

FPP Reliability & safety

THE TECHNICAL ROLE

## A clear integration boundary.

FPP Test/Management Fabric integration role: KGD/test/health/repair fabric. Documented composition: One of the co-designed package fabrics / bridge hierarchy.

01

Known-good-die and package test architecture

02

Package health and repair coordination

03

Test/management participation in the FPP fabric hierarchy

TECHNICAL OVERVIEW

## The details matter.

[Download the product brief](https://garmolabs.com/static/briefs/ip-ip-163.pdf)

Canonical identity

IP-163

Responsibility

KGD/test/health/repair fabric

Documented building blocks

One of the co-designed package fabrics / bridge hierarchy

Delivery boundary

Architecture

Evidence scope

Architecture IP

### Before integration.

FPP Test/Management Fabric integration role: KGD/test/health/repair fabric. Documented composition: One of the co-designed package fabrics / bridge hierarchy.

- Interface version and parameter set
- Clock/reset domains and integration constraints
- Companion memory, PHY and software requirements
- Verification collateral and acceptance criteria

The selected release must confirm:

- Node/library binding
- Clock/reset limits
- Physical and protocol dependencies
- Artifact hashes
- Acceptance criteria

Unpublished values are not inferred from family names or architecture targets.

[Discuss the integration](https://garmolabs.com/contact?products=ip-ip-163)

Architecture IP

## Know the release.
Know what it establishes.

Canonical technology and its architecture/integration role are recorded. The offered delivery is confirmed against the exact release before licensing.

This is a controlled-portfolio summary, not a fresh execution of the chip qualification flow.

[Explore the evidence center](https://garmolabs.com/evidence) [Qualification record](https://garmolabs.com/qualification/ip-ip-163)

### Release-specific qualification

No node-port, silicon-performance, standards certification or analog qualification is inherited from a related product.

Canonical record: Architecture

A PATH THAT FITS THE PROJECT

## Build with FPP Test/Management Fabric.

Technical scope, rights, support and release configuration are agreed before delivery.

evaluation

### Evaluate an individual IP configuration

Inspect the named release and establish technical fit.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-163&scope=evaluation)

production

### Named-design production license

Agree deployment or design rights, deliverables and support.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-163&scope=production)

custom

### Node binding or derivative integration

Define the customer-specific work and acceptance criteria.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-163&scope=custom)

## Keep exploring.

Reliability & safety

[## Garmo-ASIL-D-Monitor](https://garmolabs.com/ip/garmo-asil-d-monitor)

Safety-monitoring island architecture for fault detection, containment and supervised operation; functional-safety certification is not implied.

Evaluation package

IP-2088 · Source documented

Reliability & safety

[## GCF Lifeboat / Configuration Network](https://garmolabs.com/ip/gcf-lifeboat-configuration-network)

Configuration, SRAM init, BIST, characterization, isolation and defect patch transport

Architecture IP

IP-129 · Architecture / contract

Reliability & safety

[## GKRE](https://garmolabs.com/ip/gkre)

Quality vector; repair map; degraded-use grading; die pairing

Architecture IP

IP-102 · Architecture / contract

## Your next big idea.
Let’s build it together.

Start with a chip, a software release or a single IP block.

[Talk to Garmo](https://garmolabs.com/contact) [Start exploring](https://garmolabs.com/developers)

CANONICAL EVIDENCE RECORD · IP-163

### Architecture / contract

Architecture or interface scope is documented; release qualification must be bound before delivery.

**Record integrity and qualification boundary**9d8deb3065ea8e738e028de2df7d8610cea6f18aa3d4d258277e556037710d35

Evidence ranking for evaluation prioritization; not a probability or certification.

[How evidence priority is determined ](https://garmolabs.com/marketplace/evidence)
