---
title: Chiplet Admission Firewall | Garmo Labs
url: https://garmolabs.com/ip/chiplet-admission-firewall-ip-2014
description: Chiplet admission, quarantine and trust-boundary engine
---

[Ip](https://garmolabs.com/marketplace) › IP-2014

Security & cryptography

# Chiplet Admission Firewall

Chiplet admission, quarantine and trust-boundary engine

Executed digital evidence

[Request evaluation](https://garmolabs.com/contact?products=ip-ip-2014)

Chi Security & cryptography

THE TECHNICAL ROLE

## A clear integration boundary.

Chiplet Admission Firewall provides the documented chiplet admission, quarantine and trust-boundary engine responsibility: Chiplet admission, quarantine and trust-boundary engine Evaluate the exact IP-2014 implementation and confirm its integration contract before using it inside the target design.

01

RTL exists

02

43/0 simulation

03

BMC + induction proved

04

generic synthesis top reported at 25,644 cells. Cross-links GSH/GUL/GSCP security without replacing them

FUNCTION AT A GLANCE

## Chiplet Admission Firewall

01

RTL exists

02

43/0 simulation

03

BMC + induction proved

04

generic synthesis top reported at 25,644 cells. Cross-links GSH/GUL/GSCP security without replacing them

Documented function grouping, not a wiring diagram, interface contract or physical layout. Confirm the selected release before integration.

[Explore related engineering tasks ](https://garmolabs.com/marketplace/collections)

TECHNICAL OVERVIEW

## The details matter.

[Download the product brief](https://garmolabs.com/static/briefs/ip-ip-2014.pdf)

Canonical identity

IP-2014

Native implementation identity

IP-2014

Documented responsibility

Chiplet admission, quarantine and trust-boundary engine

Recorded evidence class

Executed digital evidence

Interface and physical parameters

Bound to the selected source/configuration; not inferred from name or family.

### Before integration.

Chiplet Admission Firewall provides the documented chiplet admission, quarantine and trust-boundary engine responsibility: Chiplet admission, quarantine and trust-boundary engine Evaluate the exact IP-2014 implementation and confirm its integration contract before using it inside the target design.

- Exact implementation and configuration manifest
- Documented interfaces and clock/reset contract
- Available reference or verification collateral
- Recorded physical views where authorized and applicable
- Integration acceptance criteria and unresolved gate list

The selected release must confirm:

- Source/configuration identity
- Interface and dependencies
- Verification evidence
- Process/library where applicable
- Authorized package and acceptance criteria

Unpublished values are not inferred from family names or architecture targets.

[Discuss the integration](https://garmolabs.com/contact?products=ip-ip-2014)

Executed digital evidence

## Know the release.
Know what it establishes.

RTL exists; 43/0 simulation; BMC + induction proved; generic synthesis top reported at 25,644 cells. Cross-links GSH/GUL/GSCP security without replacing them.

This is a controlled-portfolio summary, not a fresh execution of the chip qualification flow.

[Explore the evidence center](https://garmolabs.com/evidence) [Qualification record](https://garmolabs.com/qualification/ip-ip-2014)

### Release-specific qualification

Evidence shown is our record for this canonical implementation, not a fresh tool rerun. External foundry acceptance, silicon measurements, standards certification and unlisted interface/physical parameters are not inferred. Exact delivery and rights are agreed before licensing.

Canonical record: RTL + SIMULATION + FORMAL INDUCTION + GENERIC SYNTHESIS EVIDENCED — no physical implementation or silicon evidence.

A PATH THAT FITS THE PROJECT

## Build with Chiplet Admission Firewall.

Technical scope, rights, support and release configuration are agreed before delivery.

evaluation

### Review the exact recorded implementation and agreed test scope

Inspect the named release and establish technical fit.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-2014&scope=evaluation)

production

### Named-design rights for the agreed qualified release

Agree deployment or design rights, deliverables and support.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-2014&scope=production)

custom

### Target integration, verification or physical qualification

Define the customer-specific work and acceptance criteria.

[Discuss this scope](https://garmolabs.com/contact?products=ip-ip-2014&scope=custom)

## Keep exploring.

Security & cryptography

[## SONJE Memory-Fabric Authority / Epoch Enforcement Architecture](https://garmolabs.com/ip/sonje-memory-fabric-authority-epoch-enforcement-architecture-ip-3895)

Checks requesting domain, read/write permission masks and revocation epoch at the point where memory work is accepted.

Executed digital evidence

IP-3895 · Executed digital evidence

Security & cryptography

[## SONJE-P64 PASID / IOMMU / Authority-Version-Lock Access Guard RTL](https://garmolabs.com/ip/sonje-p64-pasid-iommu-authority-version-lock-access-guard-rtl-ip-3938)

Enforces PASID, domain, epoch, permission, expected-version and lock eligibility together at P64 memory acceptance.

Executed digital evidence

IP-3938 · Executed digital evidence

Security & cryptography

[## ORAX Trust FW-100](https://garmolabs.com/ip/orax-trust-fw-100-ip-2000)

Trust/security product

Executed digital evidence

IP-2000 · Executed digital evidence

## Your next big idea.
Let’s build it together.

Start with a chip, a software release or a single IP block.

[Talk to Garmo](https://garmolabs.com/contact) [Start exploring](https://garmolabs.com/developers)

CANONICAL EVIDENCE RECORD · IP-2014

### Executed digital evidence

Executed digital verification and/or synthesis are recorded for this implementation; physical qualification is a separate gate.

**Record integrity and qualification boundary**b9bef832b06b362e66d59e0c81a5ee0b2cd66b898ed6e405e9529136d248971a

Evidence ranking for evaluation prioritization; not a probability or certification.

[How evidence priority is determined ](https://garmolabs.com/marketplace/evidence)
